Two metrics, two questions
Net present value discounts every future cash flow back to today at the chosen rate, sums them, and subtracts the initial outlay, giving an absolute figure for what the project is worth. Internal rate of return drives that value to zero and reports the return the money itself earns. The first depends on the discount rate, the second does not, which is why they frequently rank projects differently. A large project with a moderate rate can show high value, while a tiny project with a spectacular rate shows little, yet for someone short of capital the small high-return option may win. The tool takes the cash flow series, rate and periods per year, then reports net value, IRR, payback and profitability index.
Steps
- Enter the initial outlay as a negative figure.
- Enter each period's cash flow line by line, starting with the first period after investment, and never repeat the outlay here.
- Enter the discount rate as an annual percentage, reflecting capital cost or a minimum required return.
- Choose one, two, four or twelve periods per year for annual, semi-annual, quarterly or monthly flows.
- Compute for net value, IRR, payback and profitability index, checking the sample first.
- Copy the result into your model, clear to test another scenario.
Rate, periods and multiple roots
The rate is not arbitrary: it usually equals the weighted average cost of capital or a target return for comparable projects. Changing periods per year splits the annual rate across each period, and a wrong setting shifts the whole valuation. Non-conventional flows with a large mid-life outflow can produce several IRR values, of which the tool reports one, so net value should decide in that case. Mutually exclusive projects need the IRR of the incremental flows, not each project's own. Payback ignores everything after recovery and serves liquidity only. And the profitability index divides present value by the outlay for ranking under capital constraints.
Common mistakes
Repeating the initial outlay inside period one double-counts it. Entering the discount rate as a decimal makes eight percent read as a fraction of one. Annual periods against monthly payments overvalues the project. Comparing projects of different scale on IRR alone ignores absolute money. Sign errors that turn outflows positive destroy IRR. And treating IRR as a reinvestment rate is optimistic compared with discounting at the cost of capital.
Where a single number fails
Highly uncertain flows need scenarios and sensitivity ranges rather than one figure. Tax, depreciation and financing structure require a full financial model, not a cash flow list. Optionality, staging and exit rights mean net value understates flexibility. Multi-currency flows must first share one exchange convention. And every projection needs reconciling against actual contracts and payment milestones, or precision discounts nothing.