Gantt Generator: Progress Fill, Overdue Flags and Duration Summary

Open Tool Gantt Chart Generator

How it differs from the sibling tool

Two Gantt tools exist here: one takes a start date and duration, the other takes start, end and a progress percentage. The second adds tracking information — bars filled to progress, overdue tasks flagged red, a today line — which matters more during execution than planning, because plans are optimistic and progress is real. It also summarises duration, the span from earliest start to latest end.

Steps

  1. One task per line as name, start, end, progress percent.
  2. Choose daily, weekly or monthly ticks; long spans read better monthly.
  3. Tune bar height, font size and row spacing.
  4. Toggle today, progress, gridlines, labels on bars and overdue highlighting.
  5. Generate, then download PNG, export CSV or JSON, or read the duration summary.

How progress and overdue are decided

Progress runs from zero to one hundred and fills the bar proportionally. Overdue means the end date has passed while progress is below one hundred, so the end date must be the committed date rather than an estimate or the flag means nothing. Tick granularity governs legibility: a three-month span drawn daily becomes unreadable, weekly gives seven days per tick, monthly loses intermediate detail.

Common mistakes

An end date before the start, which reverses or erases the bar. Progress entered as 0.8 and read as eight tenths of a percent. Duplicate task names that cannot be told apart in the legend or CSV. A tick setting that turns a year into three hundred columns. Skipping the duration check when a total span disagrees with manual arithmetic. And CSV opened without UTF-8, garbling Chinese names.

Using it to track

Refresh progress weekly and clear overdue items first — that loop is where the chart earns its keep. Report with PNG, since bars beat prose; analyse with CSV or JSON, feeding burndown or variance work. It records plan and progress only, not hours or headcount, so load analysis needs another tool. Run one chart per project, because merging projects destroys critical-path reasoning.

⏫︎