How a total splits into four parts
Renovation budgeting multiplies area by a per-square-metre price, then splits the total into materials, labour and other costs, leaving the remainder as contingency. A common split puts materials near 38 percent, labour near 26, and other items such as consumables and management near 8, with the remaining 28 covering design, furniture and appliances, or contingency, depending on how the quote is built. The tool takes area, unit price and the three shares, and shows the total with each part so you can see where the money goes. The real risk sits in what area and what price mean, not in the multiplication.
Steps
- Enter the area in the same definition the quote uses, asking whether it is carpet area or gross area.
- Enter the unit price for that same definition, never mixing labour-only and full-package rates.
- Set materials, labour and other shares from the actual quote rather than the defaults.
- Calculate and read the total, the three parts and the remainder.
- List what the remainder must cover, then keep the rest as contingency.
- Copy the result and compare quotes only at identical definitions.
Gross area, package scope, contingency
Gross area includes shared space and carpet area does not, a gap of well over ten percent, so pairing gross area with a price built on carpet area overshoots and the reverse undershoots. Labour-only packages exclude main materials and cost less; full packages include them for a higher but simpler price; turnkey adds furniture and appliances. Contingency is mandatory: rewiring, waterproofing and wall preparation in older flats routinely add items, and the trade reserves eight to ten percent of the total, which is exactly the shortfall left by the three shares. Labour rates vary hugely between cities, so cross-city price comparisons mislead.
Common mistakes
Applying full-package prices to carpet area and underbudgeting. Rolling appliances into the hard-fit rate. Skipping contingency and overrunning on the first change order. Leaving the default shares in place. Using third-tier prices for a first-tier city. And omitting design fees until they appear as a late charge.
Where an estimate cannot bind a contract
This produces an order of magnitude, not a quote. Rewiring bills by measured metres and wall work by actual area and finishes, neither of which unit price times area captures. Structural, fire and gas changes require professional design and pricing. Demolition, rubbish removal, reinforcement and pipe replacement in old flats exceed the model. And agreeing a lump sum verbally off an estimate invites disputes when extras arrive.