Five fields, five units
Standard cron has minute, hour, day of month, month and day of week. Each accepts a value, a range, a list, a step or an asterisk: star for any, hyphen for range, comma for list, slash for step. Five-minute intervals set the minute field to star-slash-five; daily at nine sets minute zero and hour nine. Fields separate with single spaces, and stray spaces are the commonest beginner failure.
Steps
- Fill the five fields, or build through the guided helper.
- Load examples and reset as needed.
- Copy or download the expression.
- Verify on the target scheduler, since implementations differ in field count.
The day and weekday rule
When both day-of-month and day-of-week are specified, most implementations OR them: either match fires. So day fifteen plus weekday one means the fifteenth and every Monday, not the Monday that falls on the fifteenth. Weekday numbering varies too — some start at zero for Sunday, others at one for Monday, and seven may mean Sunday — so cross-platform moves need explicit checking.
Steps and ranges together
A step after a range means every nth value from the start. Star-slash-ten over minutes yields zero, ten through fifty. A range constrains the start, so hours eight to eighteen step two runs at eight, ten through eighteen. Steps are divisibility-based rather than interval-based: star-slash-seven in minutes gives zero, seven, fourteen and so on to fifty-six, then restarts at the next hour, which is unevenly spaced.
Common mistakes
Writing six fields where a seconds field comes first breaks five-field systems. Using a question mark, which extended schedulers accept and standard cron does not. Crossing month boundaries with three-day steps, which skip or repeat. Assuming local time when the server runs UTC, shifting everything by eight hours. Ignoring daylight saving, where a two-in-the-morning job may be skipped or doubled. And treating weekday ranges as holiday-aware, which needs application logic.
Where cron is the wrong tool:Sub-minute precision exceeds standard cron's granularity. Long jobs needing retries, ordering and dependencies want a workflow engine, since cron only triggers. High availability demands locking and leader election rather than a single host. Jobs that may outrun their interval need re-entry guards to avoid stacking. And audit trails or visual history exceed cron logs, which need centralised logging and alerting.