Three numbers worth reporting together
A span has three measures: calendar days including both ends, workdays with weekends and statutory holidays removed, and the count of excluded days. Two toggles drive the calculation — exclude Saturday and Sunday, and exclude statutory holidays from the 2026 reference table. With both on, you get the days people actually work, which is the usual basis for schedules and effort estimates.
Steps
- Enter start and end dates, counted inclusively.
- Tick weekend exclusion for days without Saturdays and Sundays.
- Tick holiday exclusion for the reference table.
- Calculate to get both workdays and calendar days.
- Copy or download the result; load the sample or clear.
Why make-up days complicate things:Holidays often come with swaps: a Saturday becomes a working day, a Monday becomes a day off. Neither a weekend rule nor a holiday list alone gets this right. If the table lists only days off and not the make-up working days, workdays come out short. For real schedules, check the published year's arrangement and add those days back. Cross-year planning matters too, since next year's calendar appears late in the current one.
What different measures cost:Two teams estimating the same project in calendar days and workdays can land two or three weeks apart. Thirty workdays in a contract is not thirty days; it can be six weeks. Inclusive versus exclusive endpoints shifts a day too. Promises should state the measure, the endpoint convention and which year's table was used. Internal schedules should stick to workdays to avoid flattering estimates.
Common mistakes
Counting calendar days as workdays. Ignoring make-up days. Reversed dates producing zero. Using last year's table. Relying on one year for a project spanning two. And forgetting the endpoint convention, which turns into a reconciliation gap at month end.
Other uses
Project durations and delivery dates, probation and contract expiry, remaining leave, service response windows such as replying within five workdays, and available preparation days for an event. All share clear endpoints and a workday measure. Where you need to project an actual date — ten workdays from now — a calendar tool showing dates is clearer.
When not to use it
Durations measured in hours, such as forty working hours, cannot be converted from days because effective hours differ daily. Cross-timezone collaboration needs each site calendar, since holidays and weekends do not align. Composite and flexible hour systems do not map to five days a week and need attendance rules. Ad-hoc holiday changes leave the reference table behind. For all of these, follow HR notices and the attendance system; this tool offers a first estimate only.